The rules of successfull skunk works projects or

1. The Skunk Works® manager must be delegated practically complete control of his program in all aspects. He should report to a division president or higher.

2. Strong but small project offices must be provided both by the military and industry.

3. The number of people having any connection with the project must be restricted in an almost vicious manner. Use a small number of good people (10% to 25% compared to the so-called normal systems).

4. A very simple drawing and drawing release system with great flexibility for making changes must be provided.

5. There must be a minimum number of reports required, but important work must be recorded thoroughly.

6. There must be a monthly cost review covering not only what has been spent and committed but also projected costs to the conclusion of the program.

7. The contractor must be delegated and must assume more than normal responsibility to get good vendor bids for subcontract on the project. Commercial bid procedures are very often better than military ones.

8. The inspection system as currently used by the Skunk Works, which has been approved by both the Air Force and Navy, meets the intent of existing military requirements and should be used on new projects. Push more basic inspection responsibility back to subcontractors and vendors. Don't duplicate so much inspection.

9. The contractor must be delegated the authority to test his final product in flight. He can and must test it in the initial stages. If he doesn't, he rapidly loses his competency to design other vehicles.

10. The specifications applying to the hardware must be agreed to well in advance of contracting. The Skunk Works practice of having a specification section stating clearly which important military specification items will not knowingly be complied with and reasons therefore is highly recommended.

11. Funding a program must be timely so that the contractor doesn't have to keep running to the bank to support government projects.

12. There must be mutual trust between the military project organization and the contractor, the very close cooperation and liaison on a day-to-day basis. This cuts down misunderstanding and correspondence to an absolute minimum.

13. Access by outsiders to the project and its personnel must be strictly controlled by appropriate security measures.

14. Because only a few people will be used in engineering and most other areas, ways must be provided to reward good performance by pay not based on the number of personnel supervised.

Comments

Popular posts from this blog

Day 257

 28/11/2020 Saturday, Cloudy A shocking news from my alma mater Wechat group, one classmate died from illness one day ago. 怀念丫丫  有的同学居然再也见不到了 她,永远的离开了这个世界 从今以后,只能从记忆中搜寻她的片段 五年的青葱岁月 温文尔婉她 或许只有只言片语 青春的印迹却不曾磨灭 再也见不到了吗 就在去年,毕业20周年纪念会上有你 还有筹划中的30周年呢 永别的到来,竟是这般猝不及防 你的躯体就要永久的消失于这世界 我们心中的痛才刚刚开始融化 一个不经意间 涓涓细流化成滔滔洪水 瞬间吞没,泪崩 夜空里,点点星辰 那,有你的归宿 安息吧,我的同学

Day 48

02/05/2020 Saturday, Sunny After a week of rainy days, it's sunny again. Come across Chen Haowu on Youtube, who was one of the designers of China finantial system reform. Suprise to see he takes such a negative view on the reform result, i.e. the current status of China. An interesting view of his is that the finanace reform is a silent revolution. It changes China from public ownership to private ownership, from planned economy to market economy, from allocation by labour to allocation by capital. The formers are the three pillars of the classical socialism system. On the other hand, he seems to think China need adopt a faith/religon in order to counteract the vicious side (e.g. the unbounded pursuit of profit) of the market economy. And he's seriously considering Christianity. He also introduced the story of a Methodist Priest Samuel Pollard from Cornwall, England. In around 1900s, the priest converted a very large group of residents in Shimenkan, Guizhou province to Ch...